Section 28-303.7. Report of inspection  


Latest version.
  • A signed copy of the report of each
      boiler inspection shall be filed with the owner's annual  statement,  on
      such  forms  and  in  such  manner  as required by the commissioner. The
      report shall include a certification that identified defects  have  been
      corrected.   The   statement   shall  be  filed  within  30  days  after
      installation of a boiler. Thereafter, it shall be filed as set forth  in
      this article and in rules.