Section 28-118.8. Sanitary/storm water drainage  


Latest version.
  • No certificate of occupancy
      shall be issued until the department confirms  by  inspection  that  all
      work  relating  to  the  installation  of the part of the sanitary/storm
      water drainage system which lies outside of such  property,  if  and  as
      required  by  section  24-526  of  the  administrative  code,  has  been
      satisfactorily completed.