Laws of New York (Last Updated: November 21, 2014) |
ADC New York City Administrative Code(NEW) |
Title 28. NEW YORK CITY CONSTRUCTION CODES |
Chapter 1. ADMINISTRATION |
Article 116. INSPECTIONS AND SIGN-OFF OF COMPLETED WORK |
Section 28-116.2.3.1. Special inspection of fabricated items
Latest version.
-
Where fabrication of regulated products is performed on the premises of a fabricator's shop, special inspection of the fabricated items is required. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator's ability to conform to approved construction documents and referenced standards. The special inspector shall review the procedures for completeness and adequacy relative to the code requirements for the fabricator's scope of work. Exception: Special inspections shall not be required where the fabricator is approved by the commissioner in accordance with section 28-116.7.