Laws of New York (Last Updated: November 21, 2014) |
ADC New York City Administrative Code(NEW) |
Title 28. NEW YORK CITY CONSTRUCTION CODES |
Chapter 1. ADMINISTRATION |
Article 112. FEES |
Section 28-112.7.2. Periodic inspection fees
Latest version.
-
Table 28-112.7.2 ------------------------------------------------------------------------ Inspection Type Initial Fee Renewal Fee Comments ------------------------------------------------------------------------ Filing fee for report As provided by of critical examination rule. of exterior walls and appurtenances thereof. ------------------------------------------------------------------------ Filing fee for inspection As provided by of potentially rule. compromised buildings or structures. ------------------------------------------------------------------------ Filing fee for report As provided by of condition assessment rule. of retaining walls. ------------------------------------------------------------------------ [] Filing fee for $30 for each periodic boiler boiler. inspection report. ------------------------------------------------------------------------ Equipment inspection fee: $65 for each inspection, for each boiler. [] High-pressure boiler As provided by rule. periodically inspected as provided by section 28-303.10 [] Reinspection fee following a violation. ------------------------------------------------------------------------ [] Filing fee for report $30 for each device. of periodic inspection of elevator and other devices. ------------------------------------------------------------------------ [] Equipment inspection $65 for each in- fee: Each elevator or spection, for each other device regulated device. by this code. ------------------------------------------------------------------------