Section 27-679. Bearing capacity of nominally unsatisfactory bearing materials  


Latest version.
  • Whenever  soils  exploration  shows  that   the   proposed  foundation  would  rest on, or be underlain by, nominally unsatisfactory
      bearing materials, a report based on soil tests and foundation  analysis
      (including  analysis  of  undisturbed  samples) shall be submitted by an
      architect or engineer, demonstrating, subject to  the  approval  of  the
      commissioner,  that  the proposed construction, under a condition of one
      hundred  percent  over  load,  is  safe  against  failure  of  the  soil
      materials.
        The  report  shall  also  show  that  the probable total magnitude and
      distribution of settlement to be expected under design  conditions  will
      not  result  in instability of the building or stresses in the structure
      in excess of the allowable values established in subchapter ten of  this
      chapter. In addition, the following provisions shall apply:
        (a) Fill materials.
        (1)  CONTROLLED  FILLS.  Fills  shall  be  considered  as satisfactory
      bearing materials of class 6-65 or 7-65 when placed in  accordance  with
      the   following   procedures,   under   the  provisions  for  controlled
      inspection.
        a. Before placement of fill, the  existing  ground  surface  shall  be
      stripped  of  all  organic  growth,  timber,  rubbish, and debris. After
      stripping, the ground surface shall  be  compacted  to  the  density  in
      subparagraph d of this paragraph.
        b.  Materials  for  fill shall consist of sand, gravel, crushed stone,
      crushed gravel, or a mixture of these,  and  shall  contain  no  organic
      matter.  The  fill  materials  shall contain no particles exceeding four
      inches in the largest dimension. No more than thirty  per  cent  of  the
      material  shall  be retained on a three-quarter inch sieve. The material
      passing the three quarter inch sieve shall contain, by weight,  no  more
      than  forty  percent  passing  the  one hundred sieve, or twelve percent
      passing the two hundred sieve.
        c. The grading of the fill shall be determined in accordance with  the
      applicable procedures of reference standards RS 11-1 and RS 11-2.
        d. Fill shall be placed and compacted at its optimum moisture content,
      in  uniform  layers not more than twelve inches thick (after compaction)
      and each layer shall be thoroughly compacted to a density not less  than
      ninety-five  percent  of the density prescribed in reference standard RS
      11-3. The field density shall be verified by in-place density tests made
      on each lift of the embankment. Fill shall not be placed when frozen  or
      placed on a frozen or wet sub-grade.
        (2) UNCONTROLLED FILLS. Fill material, other than controlled fill, may
      be  used  for  the  support of buildings, other than one- and two-family
      dwellings, and may be considered as  satisfactory  bearing  material  of
      applicable class, subject to the following:
        a.  The  soil  within  the  building area shall be explored using test
      pits.  At least one test pit, penetrating at least eight feet below  the
      level  of  the  bottom  of  the proposed footings, shall be provided for
      every twenty-five hundred square feet of building area. Where such  test
      pits consistently indicate that the fill is composed of material that is
      free of voids and free of extensive inclusions of mud, organic materials
      such  as  paper,  garbage,  cans,  or  metallic objects, and debris, the
      provisions of subparagraphs b and c of this paragraph shall apply. Where
      the test pits show such voids or inclusions, the  additional  provisions
      of  subparagraph d of this paragraph shall apply. Borings may be used in
      lieu of test pits, provided that continuous samples at least four inches
      in diameter are recovered.
        b. The building area shall be additionally explored using one standard
      boring under each column. These borings shall  be  carried  to  a  depth
    
      sufficient  to  penetrate  into natural ground, but not less than twenty
      feet below grade, and a sufficient number shall  penetrate  deeper  than
      twenty  feet  as  required  to  meet the provisions of section 27-663 of
      article  two  of  this  subchapter.  Where  such  borings  show voids or
      inclusions, the provisions of subparagraph d  of  this  paragraph  shall
      apply.
        c.  The allowable soil bearing pressure on the fill material shall not
      exceed two tons per square foot.
        d. Wherever the  fill  shows  voids  or  inclusions  as  described  in
      subparagraphs a and b of this paragraph either the fill shall be treated
      as  having  no  presumptive  bearing  capacity,  or  the  building shall
      incorporate adequate strength and stiffness  to  bridge  such  voids  or
      inclusions or shall be articulated to prevent damage due to differential
      or localized settlement of the fill.
        (b) Organic silts, organic clays, soft inorganic clay, loose inorganic
      silt, and varved silt.
        (1)  The  allowable bearing pressure shall be determined independently
      of table 11-2 subject to the following:
        a. For varved  silts,  the  soil  bearing  pressure  produced  by  the
      proposed building shall not exceed two tons per square foot, except that
      for  desiccated  or preconsolidated soils, higher bearing pressures will
      be allowed.
        b. For organic silts or clays (groups OL and OH) or for soft or  loose
      soils  of  groups ML, CL, MH, and CH, the soil bearing pressure produced
      by the proposed building shall not exceed one ton per square foot except
      that a value of two tons per square foot will be permitted on soils that
      are adequately preconsolidated or artificially treated.
        (2) The report required in this section shall contain, as  a  minimum,
      the following information:
        a. Geological profiles through the area defining the stratigraphy.
        b.  Sufficient  laboratory  test  data on the compressible material to
      indicate   the   coefficient   of    consolidation,    coefficient    of
      compressibility,  permeability,  secondary  compression characteristics,
      and Atterberg limits.
        c. Where the design contemplates improvement of  the  natural  bearing
      capacity  and/or reduction in settlements by virtue of preloading, cross
      sections showing the amount of fill and surcharge to be placed on design
      details showing the required time for surcharging  shall  be  indicated,
      and  computations showing the amount of settlement to be expected during
      surcharging. Records of settlement plate elevations  and  pore  pressure
      readings, before, during, and after surcharging, shall be filed with the
      commissioner.
        d. The estimated amount and rate of settlement expected to occur after
      the  structure  has  been completed, including the influence of dead and
      live loads of the structure.
        e. A detailed analysis showing that the anticipated future  settlement
      will not adversely affect the performance of the structure.
        f.  Where  sand  drains  are  to  be  used,  computations  showing the
      diameter, spacing, and method of installation of such drains,  shall  be
      provided.
        (c)   Artificially   treated   soils.  Nominally  unsatisfactory  soil
      materials that are artificially compacted, cemented, or  preconsolidated
      (including soils compacted by vibration, cemented by chemical injection,
      or  preconsolidated  by use of electric current, but not including cases
      where preconsolidation consists solely of the use of surcharge  with  or
      without  sand  drains)  may  be  used  for the support of buildings, and
      nominally satisfactory soil materials that are similarly treated may  be
    
      used  to  resist  soil bearing pressures in excess of those indicated in
      table 11-2 for the soil in its natural state, subject to the following:
        (1)  The  vertical  and  lateral extent of the soil that is compacted,
      cemented, or preconsolidated shall conform to the  full  extent  of  the
      distribution  of  loading  that is assumed for purposes of computing the
      intensities of the  soil  bearing  pressure.  The  actual  soil  bearing
      pressure shall not exceed the limitations of subdivisions (a) and (b) of
      this  section  for  nominally  unsatisfactory  bearing materials or, for
      satisfactory bearing materials, shall  not  exceed  the  limitations  of
      table 11-2.
        (2)  After  the  treatment procedure, a minimum of one boring shall be
      made for every sixteen hundred  square  feet  of  that  portion  of  the
      building area that is supported on treated soil, and a sufficient number
      of  samples  shall be recovered from the treated soil to demonstrate the
      efficacy of the treatment.