Section 24-416. Underground electrical conductors; Brooklyn, Queens and Richmond  


Latest version.
  • Whenever the board of estimate, after hearing all the  parties  interested,  shall deem it desirable and practicable that the electrical
      conductors above ground in any  street  in  the  boroughs  of  Brooklyn,
      Queens   and  Richmond,  be  placed  underground,  the  commissioner  of
      transportation shall notify the owners or operators of  such  electrical
      conductors.  The  notice  shall  be  to  the effect that such electrical
      conductors shall be placed underground within a certain time, sufficient
      for the proper construction of underground conduits or other channels in
      such street, to  be  fixed  by  such  commissioner.  Whenever  any  duly
      authorized   company   operating  or  intending  to  operate  electrical
      conductors in any such street, shall desire to place its  conductors  or
      any  of  them  underground,  it shall be obligatory upon such company to
      file with the commissioner of transportation a map or  maps  made  to  a
      scale,  showing  the  streets  which  are  desired  to  be used for such
      purpose, and giving the general location, dimensions and course  of  the
      underground  conduit  desired to be constructed. Before any such conduit
      shall be constructed it shall be necessary to obtain the approval of the
      commissioner of transportation of such plan of construction so proposed,
      and such commissioner shall have power  to  require  that  the  work  of
      removal  and of constructing every such system of underground conductors
      shall be done according to such plan so approved.
     
        * NB Amended L.L. 69/85 § 16, language juxtaposed per Ch. 907/85 § 14