Section 24-136. Permit fees; schedules
Latest version.
-
(a) If more than one of the fee schedules prescribed by subdivision (c) of this section is applicable to the equipment, the governing schedule shall be the one which results in the highest fee. (b) If a process is to be installed or altered which has a number of units of equipment, a separate fee shall be paid for each unit of equipment. (c) the fee for a permit to install or certificate to operate equipment shall be as follows: (1) For fuel burning equipment in which the heat from the combustion of the fuel is transmitted through a heat transfer surface, or in which the heat from the combustion of the fuel is transmitted directly to the material being processed, the fee shall vary with the type of fuel used and the gross input rating at maximum designed fuel consumption of the equipment. The fee shall be as set forth in schedule A. SCHEDULE A FEES FOR FUEL BURNING EQUIPMENT Gross Input Rating or Designed Fuel Consumption Rating in Millions of Btu/Hr #4 and #6 Fuel Oil and #1 and #2 Fuel Oil Solid Fuels Gasoline and Natural Gas Fee 1.0 to less than 4.2 2.8 to less than 10 $345 4.2 to less than 7.0 10 to less than 20 470 7.0 to less than 14.0 20 to less than 35 595 14.0 to less than 21.0 35 to less than 50 700 21.0 to less than 28.0 50 to less than 70 830 28.0 to less than 35.0 70 to less than 100 940 35.0 to less than 42.0 100 to less than 140 1440 42.0 or greater 140 or greater 1440+125 per ea. add'l ten million Btu/Hr or fraction thereof (2) For refuse burning equipment, the fee shall vary with the maximum horizontal inside cross sectional area of the primary combustion chamber, as set forth in schedule B. SCHEDULE B FEES FOR REFUSE BURNING EQUIPMENT Maximum horizontal inside cross sectional area of primary combustion chamber in square feet: Fee 8 or less............................................$300 8.1 through 25.........................................475 25.1 through 50........................................750 50.1 through 75.......................................1500 75.1 or more..........................................2400 (3) For equipment other than fuel burning equipment and refuse burning equipment the fee shall vary with the designed discharge in cubic feet of gas emitted from the equipment at standard conditions of 30 inches of mercury barometric pressure and 60 degrees F. of temperature, as set forth in Schedule C. SCHEDULE C FEES FOR EQUIPMENT OTHER THAN FUEL BURNING OR REFUSE BURNING EQUIPMENT Cubic feet of gas emitted from the equipment per Environmental Rating minute: D C B A 5,000 or less $200 250 280 315 5,001 through 20,000 375 470 525 590 20,001 through 50,000 565 700 795 875 50,001 through 100,000 750 940 1060 1175 100,001 or more 1125 1405 1580 1750 (d) The fee for a permit to install apparatus shall be as follows: (1) If the apparatus is to be installed at the same time as the installation of the equipment which it will serve, no fee shall be charged. (2) If the apparatus is to be installed to serve already existing equipment which has an operating certificate, no fee shall be charged. (3) If the apparatus is to be installed to serve already existing equipment which does not have an operating certificate, the amount of the fee to install the apparatus shall be the amount payable for a permit to install the equipment itself. (e) The fee for a permit to alter equipment shall be as follows: (1) If the alteration will modify or change the design, process or arrangement of the equipment, the fee shall be the amount payable for a permit to install the unit of equipment to be altered. (2) If the alteration will increase the capacity of the equipment and the equipment has an operating certificate, the fee shall be based upon the increase in the gross output rating, designed fuel consumption, horizontal inside cross-sectional area of the primary combustion chamber or cubic feet of gas emitted per minute in the amount prescribed by the appropriate schedule as set forth in subdivision (c) of this section. (3) If the alteration will increase the capacity of the equipment and the equipment does not have an operating certificate, the fee shall be the amount payable for a permit to install the unit of equipment to be altered. (f) The fee for a permit to alter apparatus shall be as follows: (1) If the equipment served by the apparatus has an operating certificate, no fee shall be charged. (2) If the equipment served by the apparatus does not have an operating certificate, the fee shall be the amount payable for a permit to install the equipment. (g) (1) The fee to amend a permit to install or alter equipment applications that have been issued a notice of disapproval because of an unacceptable design shall be equal to fifty percent of the fee required for the permit to install or alter equipment. (2) The fee to reinstate a cancelled application for a permit to install or alter equipment shall be equal to the fee required for the permit to install or alter equipment. (3) The fee to amend a permit to install or alter equipment prior to an operating certificate for such equipment shall be equal to ten percent of the fee required for the permit to install or alter equipment. (4) If an application for a permit is cancelled or denied, no portion of the fee shall be refunded or applied to any subsequent application. (5) The fee to amend an application for a permit to install or alter equipment or control apparatus, where a notice of disapproval has been issued because of an incomplete application, shall be 95 dollars. (6) The fee to amend a permit or an application for a permit to install or alter equipment or control apparatus in any instance not provided for in paragraphs one through five of this subdivision shall be 65 dollars. * (h) The fee for an authorization to discontinue the operation of refuse burning equipment shall be $50.00. * NB Amended L.L. 49/85 § 7, language juxtaposed per Ch. 907/85 § 14 (i) The fee for an application to reinstate an expired permit to install or alter equipment or apparatus filed more than thirty days but less than one hundred eighty days after the expiration date of the permit shall be equal to fifty percent of the fee for the permit to install or alter equipment. (j) The fee for an application to reinstate an expired permit to install or alter equipment or apparatus more than one hundred eighty days after the expiration date of the permit shall be equal to the fee for a permit to install or alter equipment.